Skip to main content
Eco Vira

Method

From your brief to a shipped carton.

Fourteen stages take an order through our garment factory: inquiry, technical consultation, quotation, pattern making, sampling, fabric sourcing, cutting, printing, embroidery, sewing, in-line and final inspection, finishing, packing and shipping. Each stage has a named owner, a documented output and a checkpoint that must pass before the order moves on — which is how the failure modes common to distributed apparel supply chains are designed out rather than managed after the fact.

Principles

Why the flow is built this way.

    Sample and bulk share a floor

    The pattern makers and machinists who develop your reference garment are the same people who run your bulk order. No hand-off to a subcontracted workshop, and no gap between what was approved and what a different factory interprets from a tech pack.

    A sealed reference governs the run

    Graded patterns, an optimised marker, an approved fabric lot, signed-off strike-offs and a sealed pre-production sample form the contract the sewing floor follows. Anything not in that pack is a question to be answered before cutting begins, not an assumption to be made during it.

    Nothing skips a checkpoint

    Incoming fabric is tested for shrinkage, shade and defects; in-line inspection catches construction drift at the operator; final AQL inspection accepts or rejects the lot before it is packed. A defect found at the cutting table costs a fraction of one found at your distribution centre.

The flow

Fourteen stages, one accountable supplier.

Expand any stage to see exactly what happens, who owns it, what you receive and how long it takes. Stages one to three cover inquiry, technical consultation and quotation; four to six cover pattern making, sampling and fabric sourcing from audited textile mills; seven to eleven cover cutting, printing, embroidery, sewing and inspection; twelve to fourteen cover finishing, packing and shipping with full export documentation.

  1. 01

    Inquiry

    Day 0
    You send a brief, tech pack or reference garment. We respond within one business day.
  2. 02

    Quotation

    1–3 days
  3. 03

    Sampling

    5–10 days
  4. 04

    Fabric Sourcing

    Parallel
  5. 05

    Pattern Making

    3–5 days
  6. 06

    Printing

    Per artwork
  7. 07

    Embroidery

    Per artwork
  8. 08

    Cutting

    3–7 days
  9. 09

    Sewing

    2–4 weeks
  10. 10

    Quality Inspection

    3–5 days
  11. 11

    Packaging

    2–4 days
  12. 12

    Shipping

    Per Incoterm

Every programme follows this flow, whether the order is a 30-piece first run or a repeat container load. Tell us where you are — a sketch, a reference garment or a sealed tech pack — and we will map the remaining stages, the lead time and the cost.

Start a programme